Phase 1 -We started this project back in July 2016. This is one of the biggest and most prestigious jobs we had undertaken. The job had to be of a high standard of workmanship and overall finish. We hired in specialist shutters to ensure we created the best finish possible. The whole job consisted of building big challenging tanks for water treatment. Some of the walls were up to 6.5m tall.

 

Phase 2 -This was the follow on project from phase 1. This phase is still ongoing, phase 2 is mainly made up of the new Treated Water Tank. The tank is 50m x 40m and 6m tall. The tank has a 450mm thick wall around the perimeter and 50+ radius columns throughout the tank to support the soffit that we are supporting 6m in the air.