Back Scope of work for Littlehempston: 42m x 22m x 400mm deep reinforced base 6 x GAC contactors. 6.5m x 11.5m 400mm wide walls all around the GAC contactors at 5.840m high. Flume box along the front of the GAC contactors. 1.2m high walls with precast permanent soffit for the 300mm slab on the top…. Read more »
Gunnislake
Back D Wall created a concrete retaining tank to hold fresh water.
Belstone
Back D Wall constructed a 150 cube multi compartment water treatment tank.
EFW
Back D Wall constructed a heat and power pant that uses waste materials to generate energy
LORP
Back The Lower Otterton Restoration Project was a construction of a highway bridge and a pedestrian foot bridge.
Paignton Overbridge
Back This was a time critical project where we worked with the principle contractor who lifted in precast units during organised rail closures to build a road over a railway.