Main Contractor – John Luffman Trading
This was a project in which we were building a large concrete raft foundation and 8 metre high retaining walls which were single sided, cast against the rock face. This was a challenging project for us due to it’s location. It was situated on a beach side so access to the site was made more difficult. This was for a luxury dwelling.